Basement & Below Ground Waterproofing in Sydney
Tanking for basements, retaining walls, lift pits and below ground structures, plus crack injection for basements that are already leaking.
Get a Free QuoteCall 0410 495 592Keeping Water Out Below Ground
Below ground structures deal with water pressure from the outside all the time, and once the backfill goes in, the membrane is almost impossible to get back to. Getting it right during construction is far cheaper than trying to fix a leaking basement later.
WSA waterproofs basements, retaining walls, lift pits and below ground walls for builders across Sydney, with membranes, protection and drainage installed in stages to suit the build. For existing basements that are leaking through cracks and joints, we use polyurethane and epoxy crack injection.

Below Ground Services
Under Slab Membranes
FBT pre-applied membrane installed under the slab and behind concrete walls before the pour.
Basement Tanking
Positive side membranes to basement walls during construction.
Retaining Walls
Blockwork and concrete retaining walls waterproofed before backfill.
Lift Pits & Shafts
Waterproofing to lift pits and below ground lift shafts.
Protection & Drainage
Supply of protection and drainage systems for the builder to install during backfill.
Crack Injection
Polyurethane injection for active leaks and epoxy injection for structural cracks.
FBT Under Slab Membrane System
For new basements, the best time to waterproof is before the concrete goes in. Our FBT under slab system is a pre-applied sheet membrane laid under the slab and against the formwork or retaining structure, so the concrete is poured directly against it and bonds to it.
Once the pour is done, the membrane sits on the outside of the floor slab and concrete walls, keeping ground moisture out of the structure from day one. Because it bonds to the concrete, water can’t track along behind it the way it can with a loose sheet.
It has to be installed before the concrete pour, so we work in with the builder’s program to lay the membrane, detail the laps, penetrations, columns and junctions, and have it ready for the formwork and steel.




- Installed under the slab and behind poured concrete walls
- Bonds to the concrete as it cures
- Laps, columns and pipe penetrations fully detailed
- Must be installed before the concrete pour

Details That Matter Below Ground
Below ground leaks tend to come through the same weak points. These get our full attention:
- Construction joints and slab to wall junctions
- Tie holes, penetrations and service entries
- Membrane protection before backfill so it is not damaged
- Drainage behind the wall to relieve water pressure
- Staged visits as the blockwork goes up
- Compliance certificate issued
How It Works
Review
Send through the drawings and waterproofing design and we will price the membrane and detailing.
Staging
We work out the sequence and number of visits to suit your construction program.
Install
Membrane, detailing and protection installed in stages ahead of backfill.
Certificate
Issued with all relevant information for your certifier and your records.
Frequently Asked Questions
There is no Australian Standard that covers below ground tanking the way AS 3740 and AS 4654 cover wet areas and balconies, so it generally has to be documented and approved as a Performance Solution before work starts.
Yes. Cracks and joints that are leaking can usually be sealed from the inside with polyurethane or epoxy crack injection, without digging out the walls.
Yes. We can supply protection and drainage systems to suit the job, for the builder to install during backfill.
Yes. We work on houses with basements and garages as well as commercial and multi-residential projects.
Got a Below Ground Project?
Send us a few details below and we will get back to you. Builders can email plans to sammy@wsaustralia.com.au or call 0410 495 592.
